Tramway - built 1910.
From the old mine to the new sorting house ("Reima")
The tramway went from the inclined shaft at the old mine, over the roof of the smithy and the lunch room to the storage crate and sorting house (Reima). The highest point on the tramway was 18 m off the ground. The mine workers pushed the wagons by hand along a badly constructed track to the storage bin. From “Reima” went another tramway to the new tip.
The photos show:
- The photo where you can see people: The tramway seen towards the lift tower of the inclined shaft
- The photo where you can see only buildings: The tramway at the intake of the storage bin.